Location:
County Cork, Ireland
Project:
BIOROCK-S System with gravity discharge to a drainage field
Background:
The project is phase one of a Scandinavian Style Wood Structure Eco House. Power to the house is by Solar Energy with generator back-up. For this reason the client required a complete non-electric plant. It is a gravity discharge to an underground filtration bed. The complete system was installed and connected in less than one day.