North of Stockholm, Sweden
Vacation home: septic system upgrade
BIOROCK-S System with ST1-2000 Primary Tank & BIOROCK-S Treatment Unit / UV desinfection (tertiary treatment)
The client had no option to connect to the mains. As the Wastewater Treatment Plant was to be located in a stony area the client needed an above-ground plant but without noise and with minimum maintenance. It also required a high quality final effluen: The last module includes an UV desinfection system.
Installation was carried out by one of our trained contractors and was completed in less than 2 days.